top of page
Recent Posts

3D/2D CAD/BIM Instruction

  • Aug 30, 2016
  • 1 min read

In the past, the design team developed extensive design documentation prior to engaging the contractors. Then the contractors developed fabrication drawings that were used to fabricate and install the equipment and systems. Inherently this process is extremely time consuming and riddled with conflicts between design drawings and fabrication drawings. By engaging the entire team earlier, BIM method was used to transition directly from design concepts into fabrication modeling. This approach reduced unnecessary design documentation and improved coordination.


Comments


Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page